The storage tank proposed for the WRRF is 99 feet in diameter, 40 feet high and holds 2 million gallons. Concrete panels will be formed on-site, then placed in position in the current Pond #1 area. Pond #1 will be decommissioned. In order for equipment to access the site, a 16 foot wide road will be created. The road surface material has not yet been determined. IVGID staff reported that TRPA is not formally involved yet in the project but has been consulted regarding coverage. NDEP (Nevada Division of Environmental Protection) and NDWR (Nevada Division of Water Resources) regulations are driving the planning process. Construction is proposed to begin May 2023. 

The 60% design drawings, other WRRF Effluent Storage Tank project information, and the ability to submit feedback may be done using the below link:

https://neighborhood-washoe.hub.arcgis.com/

Public comment can be submitted to Washoe County at: 

https://survey123.arcgis.com/share/e80f200c96cb4eae8421673c7c32b3b1

0 Comments

Get notified when a new post is published on a specific topic.

Enter your email and select what topics you'd like to be notified about. You may also select all topics. This is not the newsletter. If you want to subscribe to the newsletter, please click subscribe in the menu at the top of the page.

Upcoming Events

Calendar of Events

S Sun

M Mon

T Tue

W Wed

T Thu

F Fri

S Sat

0 events,

0 events,

0 events,

1 event,

0 events,

2 events,

-

IV/CB Community Forum

0 events,

0 events,

0 events,

1 event,

2 events,

-

IVGID Board of Trustees Meeting

1 event,

0 events,

0 events,

0 events,

0 events,

1 event,

0 events,

0 events,

1 event,

-

IV/CB Community Forum

0 events,

0 events,

2 events,

1 event,

2 events,

-

IVGID Board of Trustees Meeting

1 event,

-

TRPA Hearings Officer Meeting

0 events,

0 events,

0 events,

0 events,

0 events,

1 event,

0 events,

2 events,

-

IV/CB Community Forum

0 events,